Caption Row 1. |
Caption Row 1. |
|
Caption Row 2. |
Caption Row 2. |
Caption Row 2. |
Caption Row 3. |
Caption Row 3. |
Caption Row 3. |
Beam signing messages of those who made this construction possible. |
Exterior of building with stairs going up the side. |
Second floor with view of Lakeside skyline through the windows. |
2nd floor construction is coming together nicely. |
Roof decking overlooking beautiful Lakeside mountains. |
Framing is almost ready for drywall installation. |
The silhouette of the building is almost complete. |
1st story roofline overlooking the streets in Lakeside. |
Corner view of the Lakeside constuction site from across the street. |
View from the downtown Lakeside sign. |
New health care center taking shape amongst the clouds. |
2nd story, west stairwell view – great view of Lakeside. |
Over the fence you can see the large barn shape developing. |
View from the original health center, not much parking lot left. |
Roof trusses getting installed. |
Street view – second floor construction clearly visible now. |
Corner view of the new building |
Second floor walls are up! |
Ground floor perspective – can see all the doorways to the rooms. |
Inside looking out! |
East half of the building, ground floor. |
Nice view from the shade. |
Second story floor installed, walls ready to be raised. |
Outer wall installed creating a nice hallway. |
Top down view, trusses being delivered. |
Street view of parking lot exit and the new Lakeside building. |
West side walls going in. |
Opposite side – building is really taking shape with the walls up. |
Second story floor joice installed. |
Looking east and getting a peek at the west stairwell. |
Second story framing going up. |
Ground floor walls erected. |
Ground floor perspective – showing the layout looking west. |
Framework really taking shape. Showing the true size of the facility that will help so many families in Lakeside. |
Gettting the tall view of the second story. |
View from up high on second story beams, progress being made! |
Large boom pumping in concrete for the foundation at the new Lakeside location. |
Concrete poured and curing in the sun. Real progress showing with the foundation.
|
New strong beams going in – can see the second floor taking shape. |
Foundation looking west. |
Foundation looking east. |
Getting an early morning start – pouring in the concrete. |
Excavation continues as site work moves forward. |
Concrete pour filling in all the forms. |
Forms are full – concrete is in! |
Concrete is poured for the elevator pit, marking key progress. |
Excavation begins on the elevator pit. |
Footings excavation continues as rebar installation begins. |